For applicable decorative flake floors, RS Surface Coatings uses a moisture vapor barrier epoxy base coat. The complete assembly, including any separate flake receiving coat and the protective finish, must be specified for the project. Polished concrete follows a different process.
A commercial floor is part of the way a building works. It carries people, equipment and day-to-day activity, and it has to fit the cleaning routine and the available installation schedule. Choosing a finish begins with those practical requirements and an assessment of the existing concrete.
RS Surface Coatings serves homes and businesses across Northern Indiana, North Central Indiana and Northeast Indiana. This guide explains the questions to consider when planning a commercial floor and how to compare a proposed coating assembly. It does not replace the specification for the actual products selected for your facility.
Start with the facility and its concrete
Tell the team how the space operates. Include the type of traffic, equipment, cleaning products, possible spills and any restrictions on access. Photographs and an approximate floor area help explain the project, but the concrete itself still needs assessment. An existing coating, cracks, contamination or moisture concerns may affect preparation and the proposed scope.
Separate a surface appearance problem from a building or slab problem. Active leaks, drainage issues and structural movement require their own attention. A decorative coating is not a substitute for resolving those conditions. Explain any history of water entry or previous coating failure before choosing a finish.
Decorative flake floor assemblies
A decorative flake finish gives a concrete floor a patterned appearance. Color, texture and the compatible protective finish should be considered together with the use of the space. Ask to see genuine available finish samples. Illustrative photographs help communicate a direction, but they are not precise ordering samples.
For its applicable flake assembly, RS Surface Coatings starts with mechanically prepared concrete and appropriate repairs. An MVB epoxy base coat helps manage moisture vapor within the selected product’s documented limits. Decorative flake is broadcast into the receiving layer specified for the assembly. Some systems require a separate receiver coat after the MVB, so direct broadcasting into every MVB product should not be assumed.
After the required cure, loose flake is scraped and removed, the surface is cleaned, and a compatible protective topcoat is applied. The written specification should identify these layers and the required preparation, application conditions, recoat windows and return-to-use schedule. The base coat alone does not establish the performance of the finished floor.
Explore commercial flake floor systems or read more about RS Surface Coatings’s coating process.
Solid-color and other resinous finishes
A solid-color finish offers a different visual direction from decorative flake. Discuss the appearance you want alongside the demands of the space. A product described broadly as a floor coating should not automatically be assumed suitable for every chemical, traffic level or cleaning routine.
Ask which product data supports the proposed use. If your facility has a specialist requirement, such as static control or a documented operating standard, identify that requirement at the beginning. It must be addressed by the actual specification; a general-purpose coating is not evidence of specialist compliance.
Polished concrete and grind-and-seal work
Polished concrete and grind-and-seal finishes should be discussed as their own processes. They are not automatically decorative flake assemblies and do not use the same sequence simply because both begin with a concrete slab.
The existing concrete, desired appearance, expected use and maintenance routine guide the conversation. Review the proposed preparation and finishing stages, the degree of visible aggregate or surface variation, and any specified treatment. Ask what existing marks or repairs may remain visible in the finished floor.
Learn about polished concrete and grind-and-seal work to compare the planning considerations.
Different spaces ask different things of a floor
- Automotive and manufacturing: describe vehicles, equipment, oils, spills, carts and cleaning methods. Include areas with concentrated wear and any restrictions on stopping operations.
- Aerospace and specialist facilities: identify equipment loads, substances used in the building and any documented facility requirements. These details belong in the specification discussion.
- Healthcare, education and retail: consider circulation, access, cleaning routines and how the work could be staged around occupants. A floor finish alone does not establish compliance with a facility standard.
- Food, beverage and pet-care spaces: explain wet cleaning, drainage, edges and transitions, and the cleaning products used. Texture and cleanability need to be considered together.
- Fire, police and rescue buildings: discuss vehicle bays, equipment, working routes and the practical limits on downtime. Confirm the return-to-use requirements before installation.
Compare complete proposals
A useful comparison includes much more than the price per square foot. Check whether removal of an old finish, surface preparation, repairs, edges, transitions and protection of surrounding areas are included. Make sure the proposal identifies the actual assembly and finish, along with exclusions and any conditions that could change the scope.
Review installation access and the cure schedule separately. Foot traffic, furniture, carts and vehicles may have different return-to-use requirements. Ask for the schedule that applies to the selected products and installation conditions. A category name or a fast-installation slogan does not define when a particular floor is ready.
Plan for care after installation
Request the cleaning and care instructions for the actual finish. Confirm which cleaning products and equipment are appropriate, how spills should be handled and when the first cleaning can take place. If the use of the space changes later, review whether the floor remains suitable for the new conditions.
Keep the written proposal, product information and any applicable warranty terms together. These records make it easier to understand the installed assembly and discuss future questions with the team.
Discuss your Northern Indiana project with RS Surface Coatings
Have your project ZIP code, approximate area, current floor condition and intended use ready. Include photographs and any known moisture, access or scheduling concerns. Request a quote or call (574) 377-2141 to discuss the next step.
